Covers Slab on Grade. Here you will see everything you need to build a post-tensioned or rebar engineered slab starting with soil test, plasticity Index (PI), and forming, inspection of each phase based on the new 2000 International Code (IRC). Proper staging of fill, rough plumbing, beams, steel or cables, inspections, drops, placement, and finishing slabs, and much more.
|
Format: |
Video |
|
Copyright: |
2001 |
|
Length: |
60 minutes |