This mostly on-site video describes every aspect of a poured-in-place concrete foundation with 9' basement walls. This video comes with specification sheets for your subcontractors (Footing & Foundation Phase, Excavation & Backfill Phase, and Final Grading Phases). This video also includes: discussion with the owner before construction begins; going over site plane, cut sheet, and blueprint; site access; placement of the house on the lot; staking out the continuous perimeter foundation; set back and over-dig stakes; proper excavation procedure keeping safety and access for concrete trucks in mind; ordering concrete; erecting aluminum forms on the footings; height differences of basement and garage walls; proper placement of footings with the use of a plumb bob and the set back stakes; squaring and moving aluminum forms on footers; reinforcing foundation walls with rebar; inspections needed by local code authority; discussion on subsoil conditions and some problems; beam pockets and notches for windows; placement of concrete, first in the footers then in the walls; placement of mudsill anchors; striking off forms; strip forms with safety and efficiency. Some code specifications are given as a guide only and should not be substituted for your local codes.
|
Format: |
Video |
|
Copyright: |
2000 |
|
Length: |
65 minutes |